
PCIe® 7.0 Test Overview – Protocol and Electricals
PCIe® 7.0 testing definition is underway. Do you know what is expected to be new for PCIe 7.0? Will you be ready?
Join Teledyne LeCroy PCIe 7.0 physical-layer and protocol test experts who will focus on the tests for electrical (physical layer) signal to link and transaction layers, explain the background theory, and describe how passes and failures are determined.
Part 1: PCIe 7.0 Transmitter Electrical (PHY) Test Overview
Date: Wednesday, November 4, 2026
Time: 11:00AM Pacific | 2:00PM Eastern
Duration: 60 minutes
In this session we will discuss the expected PCI Express 7.0 Transmitter tests for the Electrical (PHY) Layer.
Topics to be covered in this webinar:
- What’s new in PCIe 7.0 compared to PCIe 6.0
- Jitter measurement methodology in PCIe 7.0 compared to PCIe 6.0
- PS21 measurement methodology in PCIe 7.0 compared to PCIe 6.0
- SNDR measurement methodology
- Transmitter equalization measurements
Who should attend? Design, validation, and test engineers working on or who expect to expect to work on PCIe 7.0 devices or systems.
What will attendees learn? Changes in PCIe 7.0 compared to PCIe 6.0, and how to be prepared for PCIe 7.0 electrical compliance testing.
Presented by: Sriram Venkatesha, Product Marketing Manager

