The Sales Edge, NA Rep Newsletter | |
| | Top Performers’ Toolbox: Recently Published Content | | | | | | | Application Note: Advanced Inverter Certification with Programmable Power Systems Discover how ERDA modernized its testing environment to support accurate, repeatable, and standards-based certification of advanced inverters.
As solar, hybrid, and grid-tied inverter technologies become more sophisticated, certification laboratories must accurately reproduce real-world grid conditions.
ERDA needed to replace legacy testing systems that lacked the speed, waveform flexibility, and power capacity required for modern inverter certification. The new platform combines AC grid simulators, bidirectional DC sources, and software-driven automation to improve test accuracy, consistency, and
high-power testing capability. | | | | | Driving Renewable Energy Quality: ERDA’s State‑of‑the‑Art 270 KVA Solar Inverter Testing Infrastructure The Electrical Research and Development Association (ERDA) operates testing, evaluation, field services, and research facilities supporting India’s electrical and power sector. ERDA established a dedicated laboratory for compliance and performance testing of solar inverters, intended to support both grid‑tied and off‑grid products. |
| | | | | Please join us in welcoming Yuga Rao, who recently joined our team as Contract Administrator, supporting customer contracts, order processing, compliance, contract negotiations, and customer-facing contract support. With more than 10 years of experience in government, aerospace, defense, and regulated commercial contracting, Yuga brings deep expertise in risk mitigation, compliance, and cross-functional collaboration that will help strengthen our operations and customer support.
Yuga will be handling all correspondence with the sales team including: Completing cybersecurity,
debarment, supplier certification, and representation forms. Completing the compliance portion of RFQ/RFPs in support of the sales team. Sales team is responsible for completing the quote. Coordinating with distributors and manufacturer representatives on RFQ ownership and submission requirements. Reviewing customer flowdowns, DPAS requirements, and contractual terms. Resolving portal access, MFA, and
account credential issues. Completing vendor setup forms. Providing W-9s, ISO certifications, AS certifications, and company profile information. Updating customer supplier records. Completing annual representations and certifications. To help ensure timely
support and proper tracking, please send all inquiries and requests to: [email protected] | | | |
Notification of Departure – Dean Gillispe Please note that Dean Gillispie, RSM Aftermarket Services, is no longer with AMETEK Programmable Power, effective August 14. For any customer-related matters
requiring attention, please contact Ryan Chiarelli at [email protected] | | | | |
Spotlight – Asterion DC Half Rack Series | | | Spotlight -Asterion DC Half‑Rack Series 1.7 kW of programmable DC power—now in a compact 1U half‑rack design. The Sorensen Asterion DC Half‑Rack Series, delivers trusted Asterion‑class performance in a smaller, more cost‑effective form factor. Designed for space‑constrained test environments, it provides 1.7 kW of high‑performance programmable DC power, without compromising on control, connectivity, or reliability. | | |
| Launch Kit Includes: Note that the launch kit is also available on the Sales Portal under Resource Library > Marketing Materials (Programmble Power) > Launch Kits. | | | | | Coming Soon: Mi-BEAM Power Rack The Mi‑BEAM Power Rack is a high‑efficiency, bidirectional DC power system designed
for high‑power applications across data centers, battery testing, energy storage, microgrids, and aerospace. With energy regeneration capability, it returns power back to the grid, reducing operating costs while minimizing heat dissipation. For scalability, parallel up to 33 racks to achieve power levels up to 8.6MW. | | | | | Monthly Application Training Sessions | | | | |
VTI FundamentalsTuesday, October 20th, 2026, 9AM PST | | | Our next Application Training Session, “VTI Fundamentals“, will be held Tuesday, October 20th at 9am Pacific Time (12pm Eastern Time). You should have already received a calendar invite, but if you did not, please reach out to Steve Nunez at [email protected]. Video recordings of the Application Training Sessions can be found on the Sales Portal in the Resource Library > Training Folder.
|
| | For and even more information and resources, visit our Sales Portal! |
| | | Updates to your Team or Contact Information? Be sure to send your latest team roster so we can make sure everyone receives communications from Programmable Power. Send to: [email protected] | | | | |
View the Latest Video Content on YouTube | | | Access the latest blogs covering industry insights and trends in our Knowlege Center. | | | Meet the Asterion
DC Half Rack Series – Maximizing Rack Density without Compromising Performance Modern test systems are getting more compact, but performance expectations continue to rise. This is exactly why AMETEK Programmable power is introducing the Sorensen Asterion DC Half Rack Series – the same Asterion performance in a 1U half rack, 1.7kW package. | | | | | |
| |
Programmable Power Supplies in Advanced Semiconductor Manufacturing This article examines how programmable power supplies support modern semiconductor manufacturing and test processes, drawing directly from AMETEK Programmable Power’s semiconductor white paper.
|
| | |
| Power Architecture Testing and Validation for AI Data Centers Artificial intelligence is reshaping data center infrastructure at an unprecedented pace. As AI compute clusters drive rack densities beyond 100 kW and demand continues to grow, operators are rethinking how power is generated, distributed, converted, and backed up throughout the facility.
| |
| | |
| |
| LXI and Edge Computing: Industrial IoT for High-Performance Measurement Edge computing and industrial IoT architectures are increasingly used to reduce latency, simplify system scaling, and distribute intelligence closer to sensors and equipment. While these concepts are often associated with consumer or low-power industrial devices, similar principles have long existed in professional test and measurement systems.
| | | | | Upcoming Holidays and Office Closures | | | Thanksgiving Holiday: Thursday & Friday, November 26 & 27, 2026 | | |
Event Details | Business Unit(s) | Data Center World Power Sep. 21 – 23, 2026 Dallas, TX | Programmable Power, IntelliPower | Aerospace Test & Development Show Sep. 29, 2026 Toulouse, France | Programmable Power, VTI |
The Battery Show 2026 Oct. 12 – 15, 2026 Detroit, MI | Programmable Power | AUSA Oct. 12 – 14, 2026 Washington, D.C. | IntelliPower | Electronica Nov.
10 – 13, 2026 Munich, Germany | Programmable Power, VTI. IntelliPower | RE+ Nov. 16 – 19, 2026 Las Vegas, NV | Programmable Power, IntelliPower | Workboat Show Dec. 2 – 4, 2026 New Orleans, LA | IntelliPower | Department of War Maintenance Symposium Dec. 8, 2026 Fort Lauderdale, FL | UEI, VTI | |
| | | | Updates to your Team or Contact Information? Be sure to send your latest team roster so we can make sure everyone receives communications from Programmable Power. Send to: [email protected] | |
| | | Copyright © 2026, All rights reserved.
AMETEK Programmable Power 9250 Brown Deer Road, San Diego, CA 92121, United States +1 858 450
0085 |
| | | |